Basement Waterproofing
Brick Repair / Block Work
Doors and Windows
Bathrooms
Concrete
Construction
Site Work
Home Improvements
Project Lincoln St.
Home Inspections
CAD/Floor Plans
Snow Removal
Contact Us
About Us

Bathrooms

Here we gutted this bathroom to the floor joists and studs, then removed the portion of wall so the shower could expand to the right. The wall with the door, through which we are looking, was also moved outward 3 feet.

.

.

 

 

.

Upstairs

This was originally a bedroom upstairs, which we converted to a bathroom; complete with a 36" Jacuzzi tub. The vanity is to the left, opposite the tub. The toilet is to the right in a separate area, which originally was the closet for the bedroom.

.

 

 

 

 

.

SMIWHE

We removed the existing tub and replaced it with a 48" shower insert, and a heat lamp above.

.

 

.

 

Where the old closet was, we installed the 60" maple vanity with dual basin top. We also upgraded the old door to a wider, solid maple door.

.

.

Here we removed a wall and made ample room for the new 36" Jacuzzi tub.

.

 

GERTEN

We completely gutted this bathroom, replaced a wall, widened the door, and repaired rotted joists. The new tile floor is non-slip and durable, and the toilet is a taller, comfort height style.

.

 

 

 

In place of the old cast iron tub, we installed a replacement "walk-in" shower with seat and grab bars.

.

The new lighting adds a soft touch. We also added an exhaust fan in the ceiling.

.

TOP